The Hydro tester has three processes: flushing, pressure test, and empty water, and they run synchronously.
Each test press has three working modes of "automatic/semi-automatic/manual".
Low tension water system: water storage tank and attachment.
Electric observe and control system: electronic control table, PLC, sensor, and computer system.
The Hydro tester machine has three processes: flushing, pressure test, and empty water, and they run synchronously.
The steel pipe is loaded on the front shelf → sent to the flushing station by the material transfer device → clean the inner wall of the steel pipe → the pipe diverter is placed on the hydraulic front shelf → the pipe taking device rotates once to connect the steel pipe to the water pressure center → clamp Steel pipe→Fixed and mobile end test heads are extended to seal both ends of the steel pipe→Low pressure water fills with water and exhausts→closes the water filling valve and exhaust valve→pressurizes→holds pressure→relates pressure→retracts the fixed and mobile end test heads →Release the clamping→The pipe taking device rotates once to send out the steel pipe→empty water→discharge

Ⅰ. Basic conditions:
1. Testing Pipe: 21.3-114mm
2.Pipe length:5.0-7.0m or 5-12m
3. Pipe Material: Low carbon steel
4. Testing pressure: ≤21 Mpa( 3000psi)
5. Every time pipe piece: 3 (No. of Head =6)
6. Pressure keep time: 5-30 second
7. Seal mode: End face seal


TUBE MILL FINISHING SECTION
We provides all equipment to tube mill Finishing section:
1. Eddy current machine
2. Seam annealing machine
3. Straightener machine
4. Chamfer and end facer machine
5. Hydro Tester machine
6. Threading machine
7. Painting and oil machine
8. Automatic bundle and package machine
9. Drilling machine




Copy product links