
Cut-To-Length Line with High Speed Cutting Shear use to cut the steel coil to short piece and stack by automatic, with high speed and percision. details welcome connect to know more.


DEVICES |
V-shaped coil saddle |
Hydraulic coil car |
Hydraulic uncoiler |
Hydraulic pressing and guiding |
Hydraulic pinch device |
Transitional worktable (4m) |
Guiding device |
Leveling machine |
Code and gauge device |
Hydraulic shearing machine 10×1500mm |
Pendulum pinch device |
Unloading worktable(stacker) |
Hydraulic system and pneumatic system |
Electric control system |


Raw material: | Black steel,blue steel, galvanized steel, cold-rolling steel, prepainted steel, pickling coil |
Thickness of steel strip: | 3.0~10.0mm |
Width of steel strip: | 1000~1500mm |
Inner diameter of strip coil: | Φ508 |
Outer diameter of strip coil: | Φ1000-Φ1800mm |
Max quantity of strip coil: | 20 tons |
Cut Length: | 500~6000mm |
Cut Accuracy: | ±1.0mm |
Speed: | max 20m/min |
Input Power: | 415V 3 phase 4 Line 50Hz |
Feeding Direction: | Left side or right side |
Cutting line technical style: | Automatic fixed length and feeding feed length, fixed shear. |

Charging—uncoiling—pressing& guiding —pinch device—guiding—leveling—code and guage—cut to length—falling—collecting—manual baling.


Pre-sale service
1. We can provide machine running videos for reference
2. We will recommend the most suitable equipment according to the needs of customers
3. We can provide the layout of the factory
4. We welcome customers to visit our factory

After-sales service
1.We will delivery the machine and provide the documents on time to make sure you can get the machine quickly
2.When you finish the Preparation conditions, Our fast and professional aftersales service engineer team will go to your factory to install the machine, give you the operating manual, And train your employee until they can operate the machine well.
3.We provide one year warranty and life-long technical support.
4.Well-trained & experienced staff are to answer all your inquiries in English and Chinese
5 .24 hours for engineer response.
6.Your business relationship with us will be confidential to any third party.


Quality Control
We have the single quality department, that make sure the material of the raw materials is good, and ensure the machine running smoothly.



Copy product links
Long by picture save/share

