ERW Tube mill operators face a variety of challenges every day in their effort to produce high-quality tubing in a cost-effective and productive way.


In general, several tube mill areas should be checked on a regular basis. This should be done at least monthly, but should be based on the usage. A higher production rate or running heavier metals through the mill requires more frequent checks. Shafts should be checked for OD, looseness, bending, and parallelism. Shoulder alignment should be checked, and the integrity of the entry table, drive stands, side roll boxes, weld box, and Turk's head units should be ensured. Of course, rolls should be checked to ensure they have been installed on the correct stands.

Once a year, the mill should be aligned. A mill alignment usually takes one or two days and is most often done by a professional. Every day, the mill operator should use a setup chart and follow all operating procedures.
The operator also should know the chemistry, Rockwell hardness, width, and thickness of the strip entering the mill and should document these values. Tube size should be measured between each pass.
Most important, prepare some neccessary spare parts .
Such as IMPEDER, FERRITE ,SAW BLADES, INDUCTION COIL,STRAPPING MACHINE and so on.